If you need more compute for your organisation or your customers, we can assess a dedicated ComputeCell deployment. Workloads, continuity and data requirements determine the configuration and location.
Projects subject to assessment · No catalogue of GPUs ready for immediate use
ComputeCellConcept visualisation
For teams with an identified compute requirement
Cloud operators and private AI providers with defined customers; enterprises that need their own capacity; integrators with an identified project; universities and research centres. We can start with the problem you want to solve, even if you have not selected your GPUs yet.
01
Infrastructure for your equipment
If you already own servers or plan to acquire them, we assess their accommodation within the unit: space, power, cooling, networking and maintenance. Dimensions and compatibility are confirmed against the selected platform and manufacturer.
02
Capacity with agreed equipment supply
If your project needs to include compute equipment, we define servers, storage and networking with the relevant specialists. The proposal establishes ownership, funding and services. An enquiry starts an assessment; it does not reserve servers available today.
03
The service determines the location
Private inference, simulation, rendering and batch processing have different latency, memory, storage and continuity needs. Distributed training also depends on the network between servers. We assess those conditions before choosing the site.
04
A defined operating scope
We agree responsibility for infrastructure, platform and support, including maintenance, acceptance and recovery from failures. Availability and security terms are established for each project, not inferred from the container format.
Application, organisation, required location and date. If you already use compute, tell us what needs to improve and the volume you expect.
02
Specify the configuration
Workload, GPU or platform, storage, networking, operating hours and growth. We assess continuity, power and site conditions.
03
Prepare a proposal
Technical and commercial scope, investment, operations and acceptance tests. Capacity and dates are committed once those conditions are resolved.
Questions about dedicated capacity
Can I rent GPUs by the hour now?
xPixel currently assesses modular infrastructure projects. We do not offer GPU capacity for immediate purchase and use. We can evaluate your requirements and the scope needed for a dedicated deployment.
Can I bring my own servers?
Yes, that is a project option. We need to validate space, power, cooling, networking, warranty and maintenance against the specific equipment before confirming integration.
How do colocation and compute differ?
With colocation, the customer provides equipment and contracts infrastructure and services. A project that includes compute also specifies equipment supply and management. These are different scopes and responsibilities.
Will operations stop when there is no sunshine?
That depends on the agreed service. Continuous operation requires suitable power supply and backup. Flexible operation is only assessed if your workload tolerates interruptions, progress checkpoints and a defined delivery window.
Tell us what you need to run
Share your application, location and target date. Add capacity if you know it. If not, we start with your requirement.