Sites and energy

Your solar farm. A potential data centre

If you control land and power, we can assess their potential for a data centre alongside your solar farm. We start with site conditions and an identified compute requirement to define a viable project.

Project assessment · ComputeCell is an architecture under development

Concept visualisation of ComputeCell units alongside a solar farm
ComputeCellConcept visualisation

For asset owners, developers and energy partners

We assess opportunities with those who can provide a site or its energy supply: independent power producers, developers and asset owners. If you operate or maintain third-party plants, you can help us explore an opportunity with the owner. Each party's role is defined before project commitments are made.

Usable land and power

We review location, land rights, project status and connections. A solar farm's generating capacity does not equal the power available to draw from the grid. The assessment distinguishes generation, demand access and energy already committed under contracts.

Connectivity and access

Fibre must reach the plot with capacity, delivery times and service terms suited to the workload. Transport and maintenance access, climate, noise and site requirements also matter. A remote solar farm may suit some workloads and not others.

A service that can be sustained

Continuous operation requires a plan for hours without sunshine, backup and maintenance. Flexible workloads need agreed operating windows and interruption rules. We compare the energy profile with the useful work the customer needs completed.

Clear commercial responsibilities

You may provide land, supply energy or participate in development. The assessment establishes who invests, owns equipment, operates the facility and contracts capacity. Returns depend on the whole project: surplus energy alone does not guarantee compute sales.

Explore what ComputeCell integrates

From a site to a project decision

  1. 01

    Tell us what you have

    Your organisation, role in the asset, location and timeline. Add power or fibre details if you know them; a technical study is not needed to start the conversation.

  2. 02

    Assess the fit

    We examine power supply, connections and site conditions against a specific compute requirement.

  3. 03

    Scope the next stage

    We define the necessary studies, configuration, participants and commercial terms before an investment decision.

Questions about solar sites

Is every solar farm suitable?

No. Land, supply, permits, connectivity, access and compute demand must fit together. Installed generating capacity or proximity to a substation is not enough to establish feasibility.

Does the solar asset owner have to buy the GPUs?

Not necessarily. Equipment may belong to the compute customer or an identified investor. Ownership and funding are defined in the proposal; there is no single arrangement for every project.

Can it run entirely on solar generation?

A schedulable workload that tolerates pauses can be assessed. Continuous service must also cover nights and periods of low generation. An annual energy balance does not demonstrate hour-by-hour autonomy.

Does ComputeCell need a separate cooling container?

The base architecture integrates cooling and heat rejection into each unit. Site connections and any energy storage are sized separately. The final configuration must be validated for the climate and workload.

Start with the location

Tell us where the asset is, your relationship to it and your intended timeline. That gives us the context to define what is worth assessing.

Propose a site

Looking for AI capacity instead?